Data Center CHARLIE

Installation of a backup power generator and associated infrastructure 

Location: Stockholm

Scope: Construction safety coordinator for the execution phase (BAS-U),

Duration: 2020

 

In this project, Fidell holds a central role as Construction Safety Coordinator for the execution phase (BAS-U), overseeing the installation of a new backup power generator in the basement of a property in Stockholm.

The project scope includes not only the installation of the generator, but also the construction of a sound-insulating concrete foundation to minimize noise, the integration of a dedicated ventilation system, and the installation of cooling units to manage heat generated by the equipment.

The work is carried out in a complex environment requiring a high level of flexibility and consideration for both ongoing operations and nearby residential areas. These conditions place specific and demanding requirements on the BAS-U role, where Fidell ensures that all activities are performed safely while minimizing disruption to daily operations and the surrounding environment.

Summary of
Data Center CHARLIE

This project is essential for strengthening the building’s energy resilience and ensuring continuous operation in the event of power outages. Through effective coordination of all aspects of the installation, Fidell contributes to delivering the project in line with both technical specifications and safety requirements.

Contact us

Are you interested in what we can achieve together? Contact us to explore how we can collaborate and create socially beneficial and sustainable projects together. We look forward to supporting you every step of the way.

Per Wallström

Data Center Manager

Fredrik Doverot

Contract Manager

Per Wallström

Data Center Manager
+46 72 979 90 44 per.wallstrom@fidell.se

Fredrik Doverot

Contract Manager
+46 70 983 24 04 fredrik.doverot@fidell.se

Visiting address: Norrtullsgatan 17,
113 29 Stockholm

Phone: +46 8-96 92 00

Mail: info@fidell.se